Broad Knowledge, Unmatched Expertise
We’ve been providing fire protection solutions for high-risk, high-value facilities since 1979, completing over 700 projects worldwide. Our experience over the past six years includes:
- Fifty-six projects at fossil fuel generating plants (including 10 FGD projects) representing over $63 million of fire protection work.
- Sixty-three projects at combustion turbine / combined cycle generating plants representing over $35 million of fire protection work.
- Six projects at nuclear generating stations representing over $700,000 of fire protection work.
- Nineteen projects at industrial facilities (including new ethanol plants) representing over $17 million of fire protection work.
- Thirty-one projects on power generating or industrial cooling towers and other special structures representing over $5 million of fire protection work.
The following project summaries provide a representative overview of our recent projects.
Fossil Fuel Generating Plants
Cross Unit 3, 600 MW Fossil Fuel Generating Plant - Pineville, SC
Cross Unit 4, 600 MW Fossil Fuel Generating Plant - Pineville, SC
Springerville Unit 3, 400MW fossil fuel generating plant - Springerville, AZ
A.S. King Plant, 588 MW Fossil Fuel Generating Plant - Oak Park Heights, MN
Combustion Turbine / Combined Cycle Generating Plants
Inland Empire Energy - Romoland, CA
Port Westward Generating Plant - Columbia County, OR
Fox Energy Center - Kaukauna, WI
Nuclear Generating Plants
Browns Ferry Nuclear Station - North Alabama
DC Cook Nuclear Station - Bridgman, MI
North Anna Power Station - Mineral, VA
Industrial / Chemical Plants
Hastings Extraction/Fractionation Plant - Pine Grove, WV
Galmish Loading and Storage Facility - Pine Grove, WV
MGP Riga Ethanol Production Facility - Riga, MI
Pinal Energy Project, Ethanol Production Facility - Maricopa, AZ
Agri-Energy Ethanol Production Facility - Hopkinsville, KY
Fossil Fuel Generating Plants
Cross Unit 3: 600 MW Fossil Fuel Generating Plant
After successfully completing a previous unit at the plant site, the client hired FE Moran SHS once again because of its demonstrated experience in all elements of fire protection systems.
Location: Pineville, SC
Construction Manager: WorleyParsons
Owner: Santee Cooper
Date: June 2005 – April 2007
Scope: Installed fire protection, alarm and detection systems for new unit at existing power plant site. The project included:
- Dry Pilot Deluge systems for Main Step-up Transformer, Auxiliary Transformers, Excitation Transformer, Clean/Dirty Oil Tank and Lube Oil Reservoir
- Wet Pipe Sprinkler Systems for Turbine Under floor and lower operating floors
- Interior fire loop for the Turbine Building
- CO2 system for Turbine Enclosure
- FM200 system in Relay Room
- Electrically Actuated Deluge Systems for Coal Dust Collectors, and Pulverizers
- Preaction systems for Diesel Generator, Boiler Feed Pumps, Coal Feeders
- Standpipe systems for Boiler Building, Turbine Building, Precipitator, Gypsum Dewatering and FGD
- Emergency manual quench system for FGD
- New fire pump
- Ammonia System Vapor Suppression
back to top
Cross Unit 4: 600 MW Fossil Fuel Generating Plant – Pineville, SC
A strong working relationship forged through previous successful projects helped FE Moran SHS land this project. FE Moran SHS provided a consistent project team familiar with the plant, and a strong working relationship with the construction manager’s team, and the most cost-effective solution.
Location: Pineville, SC
Construction Manager: WorleyParsons
Owner: Santee Cooper
Date: April 2007 – Present
Scope: Provided fire protection, alarm and detection systems for new unit at existing power plant site. The project includes the following:
- Wet pipe systems for Turbine Standpipe, STG Underfloors
- Preaction systems for Boiler Feed Pumps, Coal Feeders, Diesel Generator
- Semiautomatic Dry Standpipe Systems for Boiler, Turbine and FGD Buildings
- Dry Pipe systems for Boiler Igniters, Tripper Deck
- Deluge systems for Coal Dust Collector, Pulverizer, Ammonia Fog, Ammonia Vaporizer, Main Step Up Transformer, Auxiliary Transformer, Excitation Transformer, Clean/Dirty Oil Tank, Lube Oil Reservoir Room
- CO2 system for Turbine Enclosure
- Turbine Building Interior Fire Loop
- Hose Houses
- Fire Extinguishers
- Ammonia System Vapor Suppression
back to top
Springerville Unit 3: 400MW fossil fuel generating plant
FE Moran’s years of experience with the constructor and its ability to meet the unique demands of the project made FE Moran SHS the right company for this job.
Location: Springerville, AZ
Constructor: Bechtel
Owner: Tri-State Generation and Transmission
Date: January 2005 – August 2006
- Wet pipe systems for burner fronts (3 levels), silo tripper gallery, LO piping, Mezzanine
- Lube Oil Piping, Main Control Room
- Dry Pipe and Fire Hose Systems for new Crusher Tower, TT 1, TT 2, TT 3, TT 4
- Deluge and Detection Systems for Main Transformer ,Auxiliary Transformer, Station Service Transformer, Silo Feed Conveyor C15, Transfer Conveyor 1, Transfer Conveyor 2, Transfer Conveyor 3, Transfer Conveyor 4, Crusher Bypass Conveyor C11, Power block feed Conveyor C14 A/B, Emergency Stackout Conveyor C5, Reclaim Conveyor C9, Emergency Reclaim Conveyor C7, Radial stacking Conveyor
- Preaction system for Turbine Bearings
- Foam systems for Coal Silos 1-2-3-4, Dust Collector TT1 & TT2, Dust Collector TT3, Dust collector TT4 & Silo Feed Conveyer, Dust Collector Crusher Tower
- CO2 and Detection Systems for DCS Room
- Detection Systems for Switchgear Room, Sample Room Crusher Tower, Ammonia Area, Electrical MCC Building, Baghouse, Blower Electrical Room, Water Treatment Electrical Room, Water Treatment Control Room, Water Treatment Laboratory, Coal Handling MCC Building, Coal Handling Control Room, Lime Handling MCC Building, Cooling Tower MCC Building A, Cooling Tower MCC Building B, Coal Handling Electrical Building A, Coal Handling Electrical Building B, Fly Ash Silo Control Room, SDA Penthouse, Elevator Machine Room
- Fire Extinguishers
back to top
A.S. King Plant: 588 MW Fossil Fuel Generating Plant
This project required a company with expertise in retrofitting a fossil fuel generating plant. FE Moran SHS performed numerous pre-bid walkdowns and provided cost-effective solutions, an ability to meet the complex schedule, and experience with all the systems.
Location: Oak Park Heights, MN
Constructor: Black & Veatch
Owner: Xcel Energy
Date: April 2006 – July 2007
- Wet Pipe Systems for Auxiliary Boiler Building, STG Underfloor, STG Mezzanine, Boiler Feed Pumps 11-12
- Preaction System for STG Bearings
- Dry Standpipe (Class III) for Fabric Filter
- Dry Pipe System for Conveyor R-1 Above Ground, Conveyor T-2 Above Ground East (Existing), Conveyor T1 Tunnel & T2 Above Ground (existing), TT4&5, T3 & R1
- Deluge systems for STG Lube Oil Reservoir, Auxiliary Transformer 14, Auxiliary Transformer 15
back to top
Combustion Turbine / Combined Cycle Generating Plants
Inland Empire Energy: 775MW Natural Gas Combined Cycle Generating Station
FE Moran SHS’s proven track record in meeting aggressive project schedules and its experience with California review authorities made it the perfect company to complete this job successfully.
Location: Romoland, CA
Constructor: Calpine
Owner: GE
Date: July 2006 – Present
- Dry Pipe Sprinkler Systems for Turbine Ground floor and Turbine Mezzanine (all modeled in 3-D)
- Preaction System for Turbine Bearings
- Deluge Systems for CT Lube Oil Skid, CT Hydrogen Seal Oil & Turbine Bearings, GSU, Auxiliary, CT, SFC, Standby transformers
- Wet Pipe Sprinkler System for HRSC Chemical Room
- Dry Pipe Systems for Sample, Pump, Aux Boiler, Gas Compressor, Circ Water Chemical Feed Enclosure and Maintenance area
- Hose Cabinets and Stations
back to top
Port Westward Generating Plant: 400MW Mitsubishi G1 class combustion turbine
FE Moran SHS’s strong working relationship with the constructor and experience with similar projects provided a seamless solution to this plant’s needs.
Location: Columbia County, OR
Constructor: Black & Veatch Corporation
Owner: PGE
Date: April 2006 – May 2007
- Wet Pipe Systems for Admin/Maint/Warehouse, Water Treatment Building
- Standpipe Systems for Admin/Maint/Warehouse, Water Treatment Building
- Preaction Systems for STG Bearings
- Dry Pipe Sprinkler Systems for Turbine Underfloor (all modeled in 3-D)
- Dry Pipe Systems for STG Standpipe
- Deluge Systems for Lube Oil Skids, GSU Transformers, Auxiliary Transformers, Lube Oil Piping
back to top
Fox Energy Center: 560MW Combined-Cycle Power Plant
This project required an aggressive schedule. FE Moran SHS was the only firm capable of mobilizing on site within three weeks of the project award.
Location: Kaukauna, WI
Constructor: Calpine Corporation
Owner: Fox Energy Center LLC
Date: October 2004 – October 2005
- Wet Foam Systems - Ground Floor Turbine, Mezzanine Floor Turbine
- Wet Pipe System for Boiler Feed Pump Enclosure
- Preaction System for STG bearings
- Foam System for Fuel Oil Storage Tanks, Foam Hose System
- Deluge System for Lube Oil Skid, GSU Transformers, Auxiliary Transformer, Isolation Transformer, Hydrogen Seal Oil
- Fire Extinguishers
- Stand Pipe Systems
back to top
Nuclear Generating Plants
Browns Ferry Nuclear Station: 3,440 megawatts
FE Moran SHS’s experience with cooling tower protection systems and its ability to successfully perform work in a nuclear power generating facility helped it land this job.
Location: North Alabama
Contractor: Garnett Electric
Owner: TVA
Date: March 2007 – June 2007
Scope: Designed and furnished fire alarm panel and protectowire detection system for a 16 cell Cross-flow Cooling Tower.
back to top
DC Cook Nuclear Station: 2155 MW
FE Moran SHS understands the requirements of working at nuclear facilities and has demonstrated the ability to respond quickly to the plant’s needs. On this project, FE Moran SHS offered expertise in protecting a plant transformer being installed during a tight outage schedule window.
Location: Bridgman, MI
Owner: Indiana Michigan Power Co./ AEP
Date: February 2003 – March 2003
Scope: Provided labor and material to support the removal of the fire protection system of the damaged Unit 1 main transformer, and installation of the fire protection system for the replacement transformer.
back to top
North Anna Power Station: 1786 MW
The plant owner and operating staff’s confidence in FE Moran SHS’s abilities led to numerous projects to support the fire protection needs of North Anna and other Dominion nuclear generation facilities.
Location: Mineral, VA
Owner: Dominion
Date: June 2004 – April 2006
Scope: Provide personnel, materials, and equipment necessary to design and install Main Transformer Fixed Spray FP System Modification.
- Deluge Systems for 3 Unit 1 transformers and 3 Unit 2 transformers
back to top
Industrial / Chemical Plants
Hastings Extraction/Fractionation Plant: 180,000 MCF/day Natural Gas Processing, Fractionates up to 500,000 gallons/day
On this project, FE Moran SHS worked closely with plant personnel to provide forty-two deluge systems specifically designed to meet the special detection and system sequence requirement of the plant within the project’s schedule.
Location: Pine Grove, WV
Owner: Dominion Transmission
Date: March 2004 – August 2005
- Deluge Systems for Mole Seive Towers, Inlet Filters, Dry Gas Filter Skid, Regeneration Compressor Skid, De-ethanizer Tower & Reboiler, De-ethanizer Reflux Skid, Turbo Expander Skid & Oil Cooler, Cold Separator, Cold Box, JT Valve Skid, Absorber Tower, Absorber Skid, Cold Relief, Knockout Tank, Iso-butane Treater Skid, Overhead Fin-Fan Cooler Area, Hot Oil Heater Tank & Pump Area, Depropanizer Reboiler Skid, Depropanizer Tower, Old Debutanizer, Gasoline Treaters, Natural Gasoline Pump Area-Bens, Reflux Skid, New Debutanizer, Gasoline Reboiler, Drip Fractionating Tower, C4 Splitter, Debutanizer/Splitter Reboiler, Drip Gasoline Reflux Pumps, Drip Gasoline Feed Tank, Propane Truck Loading Area 1, Propane Truck Loading Area 2
- FM200 systems for MCC 1, PDC Building, MCC 100, MCC 2, Compressor Control Building, MCC 3
- Underground Fire Water Supply and Hydrants
back to top
Galmish Loading and Storage Facility: Propane, Butane and Isobutane plant
This project required FE Moran SHS to provide a F500 foam system along with other supporting components to meet the needs of the facility.
Location: Pine Grove, WV
Owner: Dominion Transmission
Date: May 2006 – November 2006
Scope: Installed foam deluge and detection on rail spur loading racks. Project included:
- Deluge Systems for Rail Spur (3 systems), Truck Loading Water Curtain, Valve House
- Valve Houses for Truck and Rail Systems
- Underground for Truck and Rail Valve Houses
- Fire Hydrants
back to top
MGP Riga: Ethanol Production Facility
FE Moran SHS’s understanding of the unique protection requirements of an ethanol production facility, and its strong track record of working closely with local authorities, make it the perfect partner for this job.
Location: Riga, MI
Constructor: TIC
Owner: Midwest Grain Processors
Date: January 2006 – May 2007
Scope: Installed fire protection, alarm and detection system for ethanol facility. Project included:
- Wet Pipe Sprinkler Systems for Main Process Building, Maintenance Building, Control/Lab/Office areas, Pump House, Fermentation Building
- Foam Deluge Systems for DD&E Building
- Fire Pump and Pump Enclosure
- Fire Detection and Alarm Systems
back to top
Pinal Energy Project: Ethanol Production Facility
FE Moran SHS’s successful relationship with the constructor of this project, along with a strong background in ethanol production facilities, helped it land this job.
Location: Maricopa, AZ
Constructor: TIC
Owner: Pinal Energy LLC
Date: May 2006 – August 2007
Scope: Provided fire suppression, alarm and detection systems for new ethanol production facility. Project included:
- Wet Pipe Sprinkler Systems for Main Process, Fermentation, Offices, Maintenance, DDGS, Boiler Buildings and Grain Tunnel
- Deluge System (Automatic) for DD&E Structure
- Deluge Systems (Manual) for Dryer Structure
- Foam Systems for Ethanol Storage Tanks and Foam Monitors at Storage Yard Containment
back to top
Agri-Energy: Ethanol Production Facility
With the help of its strong relationships with constructors and local authorities, FE Moran SHS completed this project successfully and on time.
Location: Hopkinsville, KY
Constructor: Fagen Inc.
Owner: Commonwealth Agri-Energy
Date: November 2003 – February 2004
Scope: Installed fire suppression, alarm and detection systems. Project included:
- Wet Pipe Sprinkler Systems for Chiller Building, Process Building, Energy Center Building
- Dry Pipe Systems for Process Auxiliary Building
- Alarm and Detection Systems for Chiller, Process and Energy Center Buildings